PIT VIPER 271 DIESEL TANK
Safety:
-
Human Intervention reduced due to longer refuelling intervals lowering the frequency and likelihood of refuelling incidents.
-
Fabrication under certification on compliance AS1554.5 and AS4100 guarantees you a quality fuel vessel.
-
Proudly made in Australia.
Environmental:
-
Reduction in 50% of the likelihood of spilling fuel on site.
-
Usage warranted during the full operational life of the machine as this product is built to last.
Productivity:
-
Fuel capacity increased by 29%
-
Downtime reduced by 6.75%
-
Availability increased by 6.25%
-
Continuous operational hours (full to empty) 29.4 hours
-
Refuelling intervals/ continuous run time - Increased to 24 hours
-
The estimated increase of 142 operational hours per drill p.a.
-
One hour saved every day
-
Productivity increased of 756K of drilled tones per drill p.a.
-
50m extra each day drilled in the hour gained.
Cost Reduction:
-
Return on investment delivered in four months of operation.
-
Fleet upgrade has proven to save over $1 million p/annum
Guarantee:
-
Upgrade solution has been implemented on a fleet of 25 machines in the iron and ore industry of Western Australia.
-
Certification on compliance A1554.5 and AS4100
-
Certification on compliance ISO9001-15